Before
AfterMaster bath: tub and shower
Jetted tub and framed shower out, freestanding tub and a marble walk-in shower with frameless glass in.
Bathrooms, walk-in showers, freestanding tubs and staircases across Collin County and DFW. Torn out, rebuilt and finished by one crew, with one point of contact from demo to walkthrough.
Full master and hall bath remodels: demo, new tile floors and walls, vanities, lighting and fixtures.
Tub and shower combos and framed showers torn out, rebuilt with a waterproofed pan, large-format tile and frameless glass.
Old jetted tubs and tub decks removed, plumbing moved, and a freestanding tub set with a wall or floor-mount filler.
Carpet pulled, new treads and risers, and new posts, handrails and iron balusters.
We look at the space, talk through what you want, and give you a straight price.
If your city requires one for the work, we pull it and schedule the inspections.
Old tile, tubs, fixtures or carpet torn out, with floors and rooms around the work protected.
Framing, plumbing and electrical moved where the new layout needs them, then cement board and waterproofing.
Tile, glass, fixtures, trim and paint installed and finished.
We walk it with you, fix anything on the list, and haul off every scrap.
Real jobs, photographed before we started and after we finished.
Before
AfterJetted tub and framed shower out, freestanding tub and a marble walk-in shower with frameless glass in.
Before
AfterSame bathroom from the other side, with new floor tile, vanity, lighting and gold fixtures.
Before
AfterFrom cement board to a two-head shower with pebble accent stripes, a knee wall and a freestanding tub.
Before
AfterA cramped tub and shower combo turned into a walk-in shower with frameless glass and a rainfall head.
Before
AfterCarpet pulled, new black treads and white risers installed on the full run.
Before
AfterSame staircase at the landing, with new treads and risers under the existing iron balusters.
Before
AfterOak treads refinished black, risers and posts painted white, and a new handrail with twisted iron balusters.
Before
AfterWindow removed and the opening filled with a framed herringbone brick panel that matches the house.
Recent bathroom work across Collin County and the metroplex. See all projects.
Tile set and waiting on glass, fixtures and trim. This is what the work looks like before the final touches.
Yes. Demo, framing, plumbing and electrical changes, cement board, waterproofing, tile, glass and fixtures, handled by one point of contact.
Yes. We remove the old tub and deck, move the plumbing, tile the wall and floor, and set the new tub with a wall-mount or floor-mount filler.
Yes. We tear out the tub, build and waterproof a new shower pan, tile it and finish it with frameless glass.
Yes. We pull carpet, install new treads and risers, and replace posts, handrails and balusters.
When your city requires a permit for the work, we pull it and schedule the inspections.
Sí. Se habla español. Llámenos al (682) 200-6736 para un estimado gratis.
Free estimate, a straight price, and a crew that shows up when we say.